top of page
Welham Girls' School - Subway
DEHRADUN
The underpass below the road connects the two campuses with a Steel ring of 3 mts. A challenging project with the use of innovative technology so that work is executed with a fully functional road above the Subway. The exterior detailing matches the Neo - Tudor style of Nasreen to keep a consistent design language.
PROJECT DESCRIPTION
Subway​
​
SERVICES PROVIDED
Master planning, Architectural drawings, Structural drawings, MEP, Services, Quality Control
​
DATE COMPLETED
January 2018
​
TOTAL AREA
Length - 56 mts.
Depth - 6.25 mts. below road level
bottom of page